Proterra Energy was employed to carry out the feasibility for a micro hydro scheme on a site in rural Angus.

The site posed several challenges around the construction of the intake and in the laying of the penstock, however through careful planning and design a viable 30kW hydro scheme was proposed.

 

Installation went ahead in 2018 and the scheme is now operational with all maintenance and monitoring being carried out by Proterra Energy.

Micro Hydro Scheme Scotland In Off Grid Energy Intake

Scheme Specifications

Commissioned:

Angus

2018

30kW

Turgo

67m

63 l/s

Location:

Flow:

Head:

Turbine:

Power:

Micro Hydro Scheme Scotland Feasibility
Micro Hydro Scheme Scotland Turbine House

To learn more about making hydro work for you, contact us and speak to one of our experienced engineers.