Micro Hydro Scheme Installation Case Study: Rigg, Isle of Skye
Introduction
Rigg is one of five micro hydro schemes installed by Proterra Energy on the Isle of Skye and was commissioned in 2016 with a power output of 50kW.
The scheme operates with an over 90% load factor and so provides a reliable and secure source of local generation.
Proterra Energy continue to supply both maintenance and monitoring for the scheme.
Testimonial
“Proterra Energy installed and have serviced my micro hydro for the last 5 years. Their work ethic, knowledge and professionalism have far exceeded anything I had expected. Nothing but great things to say about this company. Highly recommend them!”
West Coast Croft – Owner
Specifications
Common
Power
50kW
Location
Isle of Skye
Commissioned
2016
Specific
Turbine
Turgo
Flow
100 l/s
Head
79m
Testimonial
Proterra Energy installed and have serviced my micro hydro for the last 5 years. Their work ethic, knowledge & professionalism have far exceeded anything I had expected. Nothing but great things to say about this company,
Highly recommend them!
West Coast Croft – Owner
Additional Information
The scheme operates with an over 90% load factor and so provides a reliable and secure source of local generation.
Proterra Energy continue to supply both maintenance and monitoring for the scheme.
Testimonial
“Proterra Energy installed and have serviced my micro hydro for the last 5 years. Their work ethic, knowledge and professionalism have far exceeded anything I had expected. Nothing but great things to say about this company. Highly recommend them!”