Proterra Energy was employed to carry out the feasibility for a micro hydro scheme on a site in rural Angus.

The site posed several challenges around the construction of the intake and in the laying of the penstock, however through careful planning and design a viable 30kW hydro scheme was proposed.

Installation went ahead in 2018 and the scheme is now operational with all maintenance and monitoring being carried out by Proterra Energy.

Specifications

Common

Power

30kW

Location

Angus

Commissioned

2018

Specific

Turbine

Turgo

Flow

63 l/s

Head

67m

Testimonial

We do not have a testimonial regarding this project. If you need to know more about this project please contact us.

Additional Information

The site posed several challenges around the construction of the intake and in the laying of the penstock, however through careful planning and design a viable 30kW hydro scheme was proposed.

Installation went ahead in 2018 and the scheme is now operational with all maintenance and monitoring being carried out by Proterra Energy.