Micro Hydro Scheme Scotland Case Study: Balintombuie

Micro Hydro Scheme, Glenmoriston, Scotland

Balintombuie is a 50kW micro hydro scheme developed by Proterra Energy on the Allt Bail' an Tuim Bhuidhe river in Glenmoriston.

Alongside the feasibility, design and build of the scheme, Proterra Energy  was able to manage and source the funding for the entire project.

The scheme now provides the client and investors with annual revenue with Proterra Energy providing system management, maintenance and monitoring.

Micro Hydro Scotland Off grid Energy Hydro Maintenance and Servicing

Commissioned:

Power:

Turbine:

Head:

Flow:

Location:

Balintombuie Micro Hydro Scheme Specifications

2016

50kW

Turgo

96m

76 l/s

Glenmoriston

Micro Hydro Scotland Off grid Energy Hydro Maintenance and Servicing
Micro Hydro Scotland Off grid Energy Hydro Maintenance and Servicing