Pica Hydro Power System Case Study: Millburn
Millburn is a pico-hydro system installed on the Black Isle by Proterra Energy in 2013. The scheme is built on an old mill burn and so utilises existing infrastructure, minimising environmental impact.
The scheme uses two turbines, but is designed so that one can be removed during summer months when flows are low, and replaced to take advantage of high flows during winter.
To see this scheme in action, check out our youtube channel on the link below.
![Micro Hydro Scotland Off grid Energy Hydro Maintenance and Servicing](https://static.wixstatic.com/media/e348b0_c542328ab641499ea9a476b6ecd6f7b3~mv2.jpg/v1/fill/w_536,h_394,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_1474_JPG.jpg)
Power:
Turbine:
Head:
Flow:
Location:
Commissioned:
700 W
Low head axial
70 l/s
Black Isle
2013
Pica Hydro Power Scheme Specifications: Millburn
2m
![Pico Hydro Scheme Scotland Off Grid Energy](https://static.wixstatic.com/media/e348b0_1ee3599ca6fe431e91b87f743856af2c~mv2_d_3648_2736_s_4_2.jpg/v1/crop/x_0,y_7,w_3648,h_2377/fill/w_470,h_306,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/millburn2.jpg)
![Micro Hydro Scheme Feasibility Scotland Off Grid Energy](https://static.wixstatic.com/media/e348b0_b1ba23e7dd17443784cd2c159f6faa4a~mv2_d_3264_2448_s_4_2.jpg/v1/crop/x_0,y_0,w_3257,h_2081/fill/w_479,h_306,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/e348b0_b1ba23e7dd17443784cd2c159f6faa4a~mv2_d_3264_2448_s_4_2.jpg)