We commissioned a new hydro scheme. New micro hydro installations at this scale are not as frequent as they used to be. However on this site, there was a suitable burn, a good location, good energy usage, and a willing and positive customer!
The Feasibility Study in 2022 identified a suitable intake location up above a small forestry block, beyond the main gate out onto the hill. It would require a tricky bit of navigation into the side of the burn to reach the dam and a challenging pipe track out, but it was the best site.