Micro Hydro Scheme Installation and Maintenance Case Study: Glen Hinnisdal, Isle of Skye
Introduction
Proterra Energy was employed to carry out the feasibility for a micro-hydro scheme in Glen Hinnisdal on Skye.
Due to the incised nature of the burn and considering the elevation head and flow availability, a 15kW scheme was identified as the best option and one that would minimise environmental disturbance. The scheme was built by Proterra Energy and commissioned in 2013.
Due to the steepness of the river course, a turgo turbine was chosen. The turbine house was located discreetly beneath a steep section of waterfalls and given a turf roof to minimise its visual impact. Proterra Energy provides the major maintenance and servicing support for the scheme and it continues to operate efficiently and produce high yields.
Specifications
Common
Power
15kW
Location
Glen Hinnisdal, Skye
Commissioned
2013
Specific
Turbine
Turgo
Flow
46 l/s
Head
50m
Testimonial
We do not have a testimonial regarding this project. If you need to know more about this project please contact us.
Additional Information
Due to the incised nature of the burn and considering the elevation head and flow availability, a 15kW scheme was identified as the best option and one that would minimise environmental disturbance. The scheme was built by Proterra Energy and commissioned in 2013.
Due to the steepness of the river course, a turgo turbine was chosen. The turbine house was located discreetly beneath a steep section of waterfalls and given a turf roof to minimise its visual impact. Proterra Energy provides the major maintenance and servicing support for the scheme and it continues to operate efficiently and produce high yields.