top of page

Installation of 9kW of solar at an Offgrid West Coast Estate

  • terrystebbings
  • May 14, 2021
  • 1 min read

Updated: Sep 17, 2024

All Hands on Deck

Proterra Energy staff heading home after a successful week installing 9kW of solar at an Offgrid West Coast Estate last month.


Offsetting carbon emissions is critical for our planet in the long term and increasingly important in the short term. Reducing dependency on diesel generators and increasing onsite renewable generation is key for offgrid sites. In this case a hybrid hydro, solar and battery system with generator reserved only for backup.




 
 
 

Comments


Proterra Energy Ltd

41 Carsegate Road,

Inverness, IV3 8EX

Follow Us

  • Facebook
  • LinkedIn
  • Instagram
  • YouTube

© 2025 Proterra Energy Ltd. | Registered in Scotland SC423188 

bottom of page