Something Old, Something New: Our Solar and Turbine Installations

Some fun facts about renewable energy installations in Scotland

Oldest Hydro Turbine Installation

We think the oldest hydro turbine we have worked on was from the 1900s (pre 1910). In fact it had no nameplate so we don’t actually know how old it was, but it generated DC. It was in Aberdeenshire and was a weird kind of transverse crossflow.

Oldest Wind Turbine Installation

The oldest wind turbine we have worked on…

Was actually on a hydro turbine. An offgrid site in Lochaber where the previous site owner took the alternator from a fallen wind turbine (a very early Proven) and attached it and the controller to a 1950s 2.5 kW Gilkes turbine.

Oldest Solar Panel Installation

And the first solar panel installation we carried out was probably one we fitted in late 2014 to an offgrid hydro controller to keep it alive in dry summers (our first hybrid system).


If you enjoy fun facts, why not sign up to our newsletter and give us a follow on Facebook and LinkedIn? We share project updates, partnership ventures, renewable energy tips and job vacancies as they arise.

And, as always, if you want to ask us about our work in renewable energy backup systems, hydro power solutions, solar generation or wind turbine installations, please get in touch.

Categories

Quick Enquiry

Get in touch with Proterra Energy directly, or use the form below to request an email or call back and we’ll get in touch as soon as possible.